Year: 2016-2018
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Development of a new Service Harbour as extension of Port of Fujairah. MUC Engineering has developed a masterplan for the harbor as well as the design of breakwaters, land reclamation quay walls.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.
Tag: quay wall
Port of Fujairah, OT2 Phase 2
Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.
ADYARD quay repair works
Year: 2013
Client: ADYARD
Location: Abu Dhabi – UAE
Description: Realization of a new quay wall with a total length of 500m for ADYARD (Topaz) in Musaffah, Abu Dhabi including the demolishing of the old jetty structure.
MUC Engineering: Client’s Consultant for detailed design and tender document preparation.
Valentine Maritime new quay wall
Year: 2012-2014
Client: Valentine Maritime (Gulf) LLC
Location: Abu Dhabi – UAE
Description: Construction of a load out facility for the new Valentine Maritime Yard in ICAD II area in Abu Dhabi. The structure comprises of a 300m long anchored steel sheet pile retaining wall with a retaining height of 10m and a concrete load out deck on piles.
MUC Engineering: Client’s consultant for detailed design and tender document preparation.
Port of Fujairah, OT2 Phase 1
Year: 2008-2010 (completed)
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Realization of a quay wall for Port of Fujairah Oil Terminal 2, Phase 1 Including construction of 1.5km of combi wall with a retaining height of 22.8m, 800m of deep water breakwater and 5 million m3 of dredging and reclamation. After completion the facility is able to receive 4 tankers up to a size of 200,000 DWT or 8 handy size tankers.
MUC Engineering: Client’s Consultant for detailed design, Supervision and Project Management.