Year: 2020-2022 (completed)
Client: Government of Fujairah
Location: Fujairah – UAE
Description: Major upgrade of the existing port at Dibba, Fujairah, UAE to increase export capacity or rock to 15 MTPA. The project included development of the new quay wall, and other port infrastructure, conveyor belt, mountain stockpile area, etc.
MUC Engineering:Feasibility study, conceptual design, review of the tender design solution on behalf of the Client.
Tag: Government of Fujairah
Port of Fujairah VLCC Berthing Facility Dredging
Year: 2014
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Creating a dredged pocket for Port of Fujairah VLCC Berthing Facility. Total volume of 2 million m3 of dredging to a depth of -26m.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.
Fujairah Northern Land Reclamation Project
Year: 2009-2011 (completed)
Client: Government of Fujairah, Fujairah Municipality
Description: Fujairah Northern Land Reclamation Project Phase 1, Reclamation of 225 hectare of new land including 5.8km of coastal protection. The reclamation fill material was rock, obtained from a nearby quarry. A total of 56 million ton has been produced to create the new land.
MUC Engineering: Client’s Consultant for detailed design, modeling studies Supervision and Project Management.
Revetment Fujairah Northern Land Reclamation Project
Year: 2008-2011
Location: Fujairah – UAE
Client: Government of Fujairah
Description: Design guidance of tender process of 5 km revetment.