Year: 2013
Location: Fujairah – UAE
Description: Development of New Fisherman Harbour including quay walls, breakwaters and dredged basin. The total length of the quays is approx. 900m.
MUC Engineering: Contractor Consultant for detailed design and numerical modeling studies.
Tag: fishermen
Al Taweelah Fisherman Harbour
Year: 2013
Location: Abu Dhabi – UAE
Description: Development of Fisherman Harbour including quay walls, breakwaters and dredged basin.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.