Year: 2014
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Creating a dredged pocket for Port of Fujairah VLCC Berthing Facility. Total volume of 2 million m3 of dredging to a depth of -26m.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.
Tag: berthing
Evacuation Berthing Facility Das Island
Year: 2012 (completed)
Client: ADNOC
Location: near Abu Dhabi – UAE
Description: Detailed design of Evacuation Berthing Facility at Das Island in exposed water, suitable for large supply vessels and small crew boats.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.