Year: 2013
Client: ADYARD
Location: Abu Dhabi – UAE
Description: Realization of a new quay wall with a total length of 500m for ADYARD (Topaz) in Musaffah, Abu Dhabi including the demolishing of the old jetty structure.
MUC Engineering: Client’s Consultant for detailed design and tender document preparation.
Tag: Abu Dhabi
Al Taweelah Fisherman Harbour
Year: 2013
Location: Abu Dhabi – UAE
Description: Development of Fisherman Harbour including quay walls, breakwaters and dredged basin.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.
Al Sadr Port Extension
Year: 2012 (completed)
Location: Abu Dhabi – UAE
Description: Development of Al Sadr Port Extension, including quay walls construction, coastal protection works, reclamation and dredged a basin to CD-6m. The total length of the quay walls is 1,100m, these are steel sheet piles anchored with a tie back anchors to a steel sheet pile anchor wall.
MUC Engineering: Contractor Consultant for detailed design and numerical modeling studies.
Valentine Maritime new quay wall
Year: 2012-2014
Client: Valentine Maritime (Gulf) LLC
Location: Abu Dhabi – UAE
Description: Construction of a load out facility for the new Valentine Maritime Yard in ICAD II area in Abu Dhabi. The structure comprises of a 300m long anchored steel sheet pile retaining wall with a retaining height of 10m and a concrete load out deck on piles.
MUC Engineering: Client’s consultant for detailed design and tender document preparation.
Evacuation Berthing Facility Das Island
Year: 2012 (completed)
Client: ADNOC
Location: near Abu Dhabi – UAE
Description: Detailed design of Evacuation Berthing Facility at Das Island in exposed water, suitable for large supply vessels and small crew boats.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.