Year: 2008 – 2009
Location: Fujairah – UAE
Client: Port of Fujairah
Description: Detailed design, guidance of the tender process and supervision over the construction works of Oil Terminal 2 phase 1 for the Port of Fujairah. The terminal comprises a new quay wall with a length of approx 1.7 for handling oil tankers up to 180,000 DWT, dredging of the entrance channel and harbour basin, reclamation and coastal protection works.