Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.
Category: Structural
ADYARD quay repair works
Year: 2013
Client: ADYARD
Location: Abu Dhabi – UAE
Description: Realization of a new quay wall with a total length of 500m for ADYARD (Topaz) in Musaffah, Abu Dhabi including the demolishing of the old jetty structure.
MUC Engineering: Client’s Consultant for detailed design and tender document preparation.
Indorama Multi-Purpose Jetty, Port Harcourt – Nigeria
Year: 2013-2014
Client: Indorama Eleme
Description: Indorama Multi-Purpose Jetty. Construction of a urea marine export facility including bulk storage and material handling system as well as a container terminal and warehouse. The quay wall comprises of a deck on piles and diaphragm wall.
MUC Engineering: Detailed design review.
Northern Pipe Rack 3
Year: 2013-2014
Client: Port of Fujairah
Description: Construction of Pipe Rack structure with a total length of 950m to connect Oil Terminals in Fujairah Oil Industry Zone with the Port of Fujairah.
MUC Engineering: Client’s Consultant for detailed design, tender document preparation and coastal engineering studies.
Vopak Horizon Fujairah Ltd. Phase 6 Offshore works
Year: 2012 (completed)
Client: Vopak Horizon Fujairah LLC
Location: Fujairah – UAE
Description: Extension of the VHFL offshore jetty with a new tier on top of the existing bridges in order to accommodate new pipes. The project comprised complete re-design of the jetty.
MUC Engineering: Contractor Consultant for detailed structural design.