Year: 2013
Location: Fujairah – UAE
Description: Development of New Fisherman Harbour including quay walls, breakwaters and dredged basin. The total length of the quays is approx. 900m.
MUC Engineering: Contractor Consultant for detailed design and numerical modeling studies.
Category: Project
Al Taweelah Fisherman Harbour
Year: 2013
Location: Abu Dhabi – UAE
Description: Development of Fisherman Harbour including quay walls, breakwaters and dredged basin.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.
Emirates LNG Reclamation Project
Year: 2013
Client: Government of Fujairah, Fujairah Municipality
Location: Fujairah – UAE
Description: Reclamation of land and coastal protection for development of LNG terminal in Fujairah.
MUC Engineering: Client’s Consultant for detailed design, tender document preparation and project supervision.
Port of Fujairah Northern Breakwater
Year: 2013-2015
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Port of Fujairah Northern Breakwater Project for enclosing of OT2 harbour basin. The total length of the breakwater is 3km. It extends into deep water to a depth of 26m.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
Concord Oil Terminal
Year: 2013-2014
Client: Concord Energy
Location: Fujairah – UAE
Description: Green field development of an Oil Storage Terminal with a total capacity of 1,000,000 m3 including all earthworks, tank structures, pumps, offices and other related infrastructure.
MUC Engineering: Contractor’s consultant for detailed design civil works.
IL&FS Tank Terminal
Year: 2013-2014
Client: IL&FS Prime Terminal
Location: Fujairah – UAE
Description: Green field development of an Oil Storage Terminal with a total capacity of 600,000 m3 including all earthworks, tank structures, pumps, offices and other related infrastructure.
MUC Engineering: Contractor’s consultant for detailed design civil works.
Northern Pipe Rack 3
Year: 2013-2014
Client: Port of Fujairah
Description: Construction of Pipe Rack structure with a total length of 950m to connect Oil Terminals in Fujairah Oil Industry Zone with the Port of Fujairah.
MUC Engineering: Client’s Consultant for detailed design, tender document preparation and coastal engineering studies.
Al Sadr Port Extension
Year: 2012 (completed)
Location: Abu Dhabi – UAE
Description: Development of Al Sadr Port Extension, including quay walls construction, coastal protection works, reclamation and dredged a basin to CD-6m. The total length of the quay walls is 1,100m, these are steel sheet piles anchored with a tie back anchors to a steel sheet pile anchor wall.
MUC Engineering: Contractor Consultant for detailed design and numerical modeling studies.
Valentine Maritime new quay wall
Year: 2012-2014
Client: Valentine Maritime (Gulf) LLC
Location: Abu Dhabi – UAE
Description: Construction of a load out facility for the new Valentine Maritime Yard in ICAD II area in Abu Dhabi. The structure comprises of a 300m long anchored steel sheet pile retaining wall with a retaining height of 10m and a concrete load out deck on piles.
MUC Engineering: Client’s consultant for detailed design and tender document preparation.
Evacuation Berthing Facility Das Island
Year: 2012 (completed)
Client: ADNOC
Location: near Abu Dhabi – UAE
Description: Detailed design of Evacuation Berthing Facility at Das Island in exposed water, suitable for large supply vessels and small crew boats.
MUC Engineering: Contractor’s Consultant for detailed design and numerical modeling studies.