Year: 2023 – on going
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: To supply rock material for the (follow-up) reclamation works of the FNLRP Phase 4 – Spare Area 5B site into the new FNLRP Phase 5-Spare Area 5C site.
All quarry run rock material (47,000,000 tons in 0-1000kg and 0-300kg sizes) for reclamation filling purposes up to a final level + 5.0 m CD for Spare Area 5C.
MUC Engineering: Client’s Consultant for Supervision and Management.
Category: Project
Construction of 33 Access Bridges to FOIZ Oil Terminals
Year: 2022 – on going
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: The area north of the Port of Fujairah is a designated zone for accommodating Oil Storage Terminals. This area, further referred to as Fujairah Oil Industrial Zone (FOIZ), is subject to rapid expansion due to the increasing demand for oil storage capacity in recent years. The bunker market is a driving force in the business. FOIZ intends to construct access bridges for each of the terminals to assure uninterrupted access to the FOIZ terminals even during laying and maintenance of oil and service pipes.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
Fujairah Airport Tunnel Project (Phase 3)
Year: 2023 – on going
Client: Department of Public Works and Agriculture
Location: Fujairah – UAE
Description: Construction, Completion, Maintenance and Guarantee of Fujairah Airport Tunnel Phase 3 works in 2 parts: 1st is at the North and South end and between Merashid-Rughaylat road junction, continuing South through FIA tunnel up to Fujairah-Sharjah border and extending further towards east up to Abattoir and towards west up to Al Hayl first roundabout.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
Fujairah Airport Tunnel Project (Phase 1 and 2)
Year: 2020 – 2021 (Completed)
Client: Emiri Court
Location: Fujairah – UAE
Description: The airport tunnel is approximately 540 m in length from the north ramp to the south ramp and accommodates dual lanes each way. The Phase 1 and 2 Scope of Works is to carry out civil works for the construction of approximately 500.02 m of tunnel length and includes the north and south portals.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
Barracuda Beach Resort Shoreline Protection
Year: 2022 – 2023 (Completed)
Client: Barracuda Beach Resort
Location: Umm Al Quwain – UAE
Description: Rehabilitate and rectify the 650 M Beach Front at Umm Al Quwain Beach Resort.
MUC Engineering: Sub-Contractor for rehabilitation of Barracuda Beach Resort.
FOIZ Emergency Response Center
Year: 2019 – 2021
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone (FOIZ) intends to construct a new Fire Station with firemen training facilities on an allocated plot (Spare Area 1B or 1C) within FOIZ.
The scope of the new Fire Station is to provide first response in case of emergency within the FOIZ boundaries.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
FOIZ Central Control Room Building
Year: 2019 – 2021
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone (FOIZ) intends to construct a Central Control Room (FOIZ CCR) building within the FOIZ Emergency Response Center (Spare Area 1B) plot.
The function of the new FOIZ CCR building is to monitor Fujairah Oil Industry Zone with video surveillance.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.
FEED design of Port Control Building as Part of the 2D Quay Wall Project in Sohar Port
Year: 2019-on going
Client: Sohar Port Freezone
Location: OMAN
Description: FEED design of Port Control Building as part of quay wall project in Sohar – Oman with basic starting points as provided by the contractor summarized as follows:
Port Control building (from tender):
• An area as shown on the drawing is located for the Port Control building.
• As maximum the building shall be for a height of 40 m to overlook the Port basin, the South Operation, the Port Approach channel, Vale Jetty Operation and the Future North. The height will be confirmed at a later stage.
• The maximum built up area shall be 1000 m2 on different stories. The footprint shall be decided later.
• The building shall be an iconic building for SOHAR Port.
MUC Engineering: Contractor’s Consultant for tender support, basis of design, detailed design and Preparation of NOC documentation and obtaining required NOCs.
Dibba Bulk Cargo Port
Year: 2020-2022 (completed)
Client: Government of Fujairah
Location: Fujairah – UAE
Description: Major upgrade of the existing port at Dibba, Fujairah, UAE to increase export capacity or rock to 15 MTPA. The project included development of the new quay wall, and other port infrastructure, conveyor belt, mountain stockpile area, etc.
MUC Engineering:Feasibility study, conceptual design, review of the tender design solution on behalf of the Client.
Dadna Port
Year: 2021-2022 (ongoing)
Client: Crown Prince Council of UAE
Location: Fujairah – UAE
Description: Demolition of the existing port facilities, and construction of the new port for the longest superyacht in the world currently including quay wall construction, breakwater, revetments, etc.
MUC Engineering: Detailed design of the project